Use these worksheets alongside the complete planning guide. Copy the tables into the organization’s project record and assign an owner to every unresolved item. Keep camera locations, network diagrams and credentials in an appropriately controlled repository; do not publish a detailed security layout.

Project brief

Field Decision to record
Property and scope Buildings, outdoor areas, operating hours and excluded areas
Operational objectives Events to document, required detail and review/response workflow
Responsibilities Facilities, IT, security, privacy/legal and final acceptance owner
Constraints Existing equipment, access windows, network capacity, procurement and growth

Camera schedule

Create one row per camera and a separate row per sensor or stream when it performs a distinct task.

Camera ID and scene Required evidence Design and test record
Location, view boundary and mounting point Target, distance, movement and day/night detail Model, lens, firmware, stream and representative export
Network and power Port, cable, PoE demand and required continuity Test result, UPS dependency and recovery behavior
Privacy and access Excluded areas, approved features and authorized roles Mask verification in live view, playback and export

Recording and retention worksheet

Record each stream’s measured average bitrate, peak behavior, recording schedule, pre-event buffer and required retention. State where full-resolution recordings and incident exports are stored. Show usable storage after redundancy and reserve, then verify actual oldest available footage after the system has operated long enough. Record the person authorized to place and release an incident hold.

Role and disclosure matrix

Role Allowed activity Control to verify
Viewer Approved live views Restricted cameras and no unintended export
Investigator Playback and authorized incident preservation Audit trail, export approval and disclosure record
Administrator Configuration and account maintenance Named account, MFA where available and change record

Acceptance record

For each requirement record the test date, exact version, expected result, observed result, evidence filename, reviewer and outstanding exception. Include moving subjects in day/night conditions, multi-camera playback, time synchronization, export on another workstation, offline alerts, authorized outage recovery and account removal. Do not close an exception with a vague “system works” statement.

Handover checklist

Retain the final design, inventory, licenses, support periods, configuration backup procedure, patch responsibilities, maintenance schedule, operator training and recovery instructions. Transfer credentials securely and separately from the general documentation. Revisit the record when layouts, lighting, staffing or equipment change.